top of page

James Logan High School
Theater Arts
Rebuilding
James Logan has a storied theatre tradition dating back to the 1960s, and we're proud to be its current stewards. Great theatre programs don't happen by accident. Behind every curtain call is years of unseen work: building facilities, acquiring equipment, developing curriculum, training students, and forming community partnerships. This page documents that work, both past and present, so it's clear what it takes to build and sustain a thriving program.

01
Tool Storage
In the loft there is a secure room (to the left of the PPE rack) All of the tools were on the ground and unsorted. Now all the tools are on shelves easy to identify.

02
Painting Supplies
With the dead paint gone it's now possible to store good paint. We now have enough roller arms, poles, and brushes to do several productions.

03
Storage Rack
Part of cleaning up the building table was having a place to store everything. With supplies from Amazon and Harbor Freight everything now has a home. Personal Protection Equipment (PPE) now has an easy to access home.

04
Concessions Cabinet
The Center For The Performing Arts (CPA) has a true concessions window in the lobby. Extra concessions are now stored here and safely locked away. Cabinets labeled so that it's easy to know whose supplies are in them.

05
Concessions Cabinets
The Center For The Performing Arts (CPA) has a true concessions window in the lobby. Extra concessions are now stored here and safely locked away. Cabinets labeled so that it's easy to know whose supplies are in them.

06
Cashbox 2
Those little things most people don't think about till it's time to put on a production included things such as not having cashboxes for tickets and concessions. To make certain they could be told apart vinyl letters were cut using a Cricut.

07
Cash Box
Those little things most people don't think about till it's time to put on a production included things such as not having cashboxes for tickets and concessions. To make certain they could be told apart vinyl letters were cut using a Cricut.

08
Stair Unit
One of the items most used in the theater world is a good staircase unit. Unfortunately none were found. Two identical ones were made for the production of "The Seussification Of Romeo & Juliet"

09
Work Table 2
Continued work on the work table. In the lumber room there was a bunch of scrap 1/2" thick plywood scrap not really good for anything, but to be cut for cleats. We now have a stock of square, rectangle, and triangle cleats for building flats.

10
Work Table
No before shot, but this work table was completely covered in random hardware and detritus. Now it's clean enough to actually work on

11
Paint Disposal
Up in the loft there was over 20 gallons of dead paint growing Eldritch monsters. Properly disposed, it's no longer in the way.

12
Tape Ball
The stage hadn't had old tape scraped off of it in ages. This ball was about the size of a soft ball.

13
Office clean out
Cleaning out the office of the theater classroom. This was all old paperwork that needed to be properly disposed of as well as incomplete scripts and general trash. (Full scripts were kept for reference)

14
Planning ahead
On the window to the office a dry erase calendar was setup. These are regularly updated so students know what is going to be happening soon.

15
Soft goods
In lumber storage was a theatrical hamper with a couple of legs, a border, and full stage curtain. Students were trained the proper way to fold theatrical curtains (towards center) so that they would properly fit into the hamper. Once the hamper was full loaded it was taken down on the orchestra lift to lower storage.

16
Building Deck
With the old set piece gone and lumber storage cleaned out the building deck is completely open.

17
Lumber Storage
After the first round of cleanups full access to the lumber room was restored.

18
Lumber Storage 2
Second load of garbage from lumber storage ready to go out. Was almost tempted to keep the chalk board in case we did Mathilda, but that would probably be way down the road if at all.

19
Lumber Storage 1
First load of garbage from lumber storage ready to go out

20
Leftovers 8
Final styrofoam blocks stacked to be taken out.

21
Leftovers 7
Everything stacked up nicely. First time this part of the shop area has been open in a year and a half

22
Leftovers 6
Styrofoam blocks stacked to be tossed. While it is a great material there is a lot of liability if students use hot carve tools without the proper ventilation

23
Leftovers 5
Front half of the set piece begins deconstruction. Elevated platform completely deconstructed as it was not built from standard pieces (custom build) Wood preserved for future use.

24
Leftovers 5
All the styrofoam has been removed at this point revealing all the base pieces.

25
Leftovers 4
First big push on dismantling the set piece. At this point half of the styrofoam had been removed

26
Leftovers 3
When first trying to deal with the set piece we cut in small pieces to see how it was put together. This turned out to be an inefficient way to handle this.

27
Leftovers 2
Hiding under the cloth was giant blocks of styrofoam. Not typically how a set piece such as this would be constructed but it worked. Reciprocating saw was used to notch the blocks as much as possible and then brute force (kicks) were used to dislodge it.

28
Leftovers 1
This is a set piece left over from the '24-'25 school year. In the beginning of the '26-'27 school year it was still occupying a footprint roughly 12'x20' and limiting access to the building/staging area of the theater. It took about 20 hours to break it into manageable chunks and then preserve the useuable parts.
bottom of page